Dry Rot Case Study

Client contact NWDR after seeing what a mushroom creeping out of the floorboards.

After our survey we came up with a schedule of works which included taking out all affected timbers, taking plaster off walls up to a height of 1 meter, treating the masonry with a biocide and then replacing all timbers and replastering the wall.

Get In Touch

Tel: 0330 133 3266

Email: info@northwestdryrot.co.uk

Address:
39 Acacia Ave
Liverpool
L36 5TN

  • Drop files here or
    Accepted file types: jpg, png, Max. file size: 8 MB, Max. files: 5.
      Please add images if available in order for us to advise best options. Allowed files: jpg, png. Max file size: 8MB.